Sign In | Join Free | My phrmg.org
China Qingdao Powerup International Trade Co.,Ltd logo
Qingdao Powerup International Trade Co.,Ltd
Qingdao Powerup International Trade Co., Ltd is supplying all kinds of steel structure / towers and high precision machined components.
Active Member

5 Years

Home > Steel Structure Office Building >

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Qingdao Powerup International Trade Co.,Ltd

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Brand Name : POWERUP

Model Number : POWERUP-010

Certification : ISO9001, ISO14001, ISO18001

Place of Origin : China

MOQ : 10 MT

Price : Negotiation

Payment Terms : L/C, T/T

Supply Ability : 2000Ton per Month

Delivery Time : 26 working days after prepayment

Packaging Details : Use steel belts and soft blanket to do packing, each bundle will be attached with packing list.

Material : Q235B, Q345B, Q420B

Bolt Grade : 4.8S, 6.8S, 8.8S

Surface Treatment : Hot-dip Galvanized, Painted

Color : According to client's request

Contact Now

Design and manufacture Q235B, Q345B Hot-dip Galvanized or Painted Building Steel Structure with EN1090 Certification.

Steel structure buildings is a new type of buildings which is widely used as workshop, warehouse, office building, school buildings, hangar, car parking, stadium, etc. It is easy assembly, quick installation, long life, recycle using factors, the steel structure buildings can replace the traditional concrete buildings or brick buildings.

Characteristics of steel structure building:

1. Enviromental friendly

2. Lower cost and maintenance

3. Long using time up to 50 years

4. Stable and earthquake resistance up to 9 grade

5. Fast construction, time saving and labor saving

6. Good appearance

Below materials are general used in steel buildings , each type will be customized depend on clients requirements

Item Name Materials Characteristics Material Grade Surface Treatment
Steel Column H shape,Box,Steel Pipe,Hot tolled sheet Q235B,Q345B Paint or Hot dip Galvanized
Steel beam H shape,Box,Steel Pipe,Hot tolled sheet Q235B,Q345B Paint or Hot dip Galvanized
Steel Bracing Steel Rod,Steel Pipe,Angle Steel Q235B,Q345B Paint or Hot dip Galvanize

Service Design, Fabrication and Installation
We can make quotation according to customer's drawing or requirement; (size by length/width/height and wind speed), offering a free design drawing and all detailed drawings for installation.
Design software: Auto CAD,PKPM,MTS,3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc
Packing According to customer's requirement
Load into 40/20GP,40HQ or 40OT

The following are some of our photos for you to check:

1. Our workshop:

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

2. Steel structure under fabrication:

Large Steel Structure High Rise Building , Strong Steel Structure Industrial BuildingLarge Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

3. Our inspector is doing UT test:

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

4. Our steel structure products under construction:

Large Steel Structure High Rise Building , Strong Steel Structure Industrial BuildingLarge Steel Structure High Rise Building , Strong Steel Structure Industrial Building

5. Our Loading:

Large Steel Structure High Rise Building , Strong Steel Structure Industrial BuildingLarge Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

If you are interested in our steel structure products, please don't hesitate to contact us. We are sure to give you a competitive price and a perfect quality. And welcome to visit our factory!


Product Tags:

industrial steel frame buildings

      

steel frame commercial building

      
 Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building Manufactures

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Powerup International Trade Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)